2.1.1 Check points:
a. Condition of materials;
b. Whether the blanking of semi-finished products conforms to the drawings;
c. Whether the size is correct;
d. Whether the riveting hardware is loose, misplaced, riveted, etc.;
e. Whether the shape of the material is complete;
f. Whether there are burrs;
g. Whether there are crush or scratches that cause the surface of the material to be uneven.
In any case of problems listed, material shall be reworked after after approval.
2.1.2 Extraction method: random extraction, according to GB/2828.1-2003, sampling level AQL0.4;
2.1.3 After the inspection, IPQC Process Tour Inspection Record Form is submitted, and department manager shall sign the form when accepted.
2.2.1 Check points:
a. Whether the forming of the material is the same as the drawing;
b. Whether the surface of the material parts is smooth;
c. Whether the forming size of the material is correct.
2.2.2 Extraction method: random extraction, according to GB/2828.1-2003, sampling level AQL0.4;
2.2.3 After the inspection, IPQC Process Tour Inspection Record Form is submitted, and department manager shall sign the form when accepted.